A Rowan company - serving Santa Clarita, CA

ActiveYards Home Additions & ADU Nationwide

Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

Your dream remodel for as low as $199/month*on approved credit; ask for current terms
Styles & brands we work with

Kitchen remodeling
Kitchen remodeling
Bathroom remodeling
Bathroom remodeling
Home additions & ADU
Home additions & ADU
Roofing
Roofing
Windows & doors
Windows & doors
Driveway & pavers
Driveway & pavers
Fence
Fence

Before & after – our own jobs

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

ActiveYards Home Additions & ADU: The Santa Clarita Owner’s Guide

We stock and install ActiveYards-compatible components for home additions and ADU projects in Santa Clarita, with typical installed pricing from $45,000 to $130,000 for full additions and $90,000 to $220,000 for detached ADUs. Most Santa Clarita homeowners discover issues during the permitting phase or mid-construction when structural connectors, aluminum post sleeves, or gate hardware specified in the ActiveYards catalog don’t integrate cleanly with the addition’s framing or ADU setback requirements. We carry the full ActiveYards residential hardware line and can match your existing posts and panels to new construction without starting from scratch.

Call (747) 294-3985

Which ActiveYards Models This Applies To

ActiveYards produces three residential series that appear regularly on Santa Clarita home addition and ADU plans: the Dogwood (decorative aluminum), the Hawthorne (semi-privacy), and the Glendale (full privacy). The Dogwood uses 1.5-inch square posts with proprietary bracket spacing at 72 inches on center, which conflicts with standard 48-inch or 96-inch framing modules if your addition ties into an existing fence run. The Hawthorne and Glendale share a 2-inch post extrusion but use different wall thicknesses, 0.060 inch versus 0.080 inch, and the bracketry is not interchangeable despite what some suppliers suggest.

To identify your series, check the inside face of the bottom rail for an embossed date-and-series stamp, or measure post wall thickness with a caliper at the cut end if you have scrap from a prior modification. The Haven Standard requires us to document this match in writing before we order, because we’ve seen Santa Clarita HOAs in Valencia and Stevenson Ranch reject fence tie-ins when the new section’s post profile visibly differs from the existing run. We source OEM ActiveYards brackets and posts through the manufacturer’s West Coast distribution, and we also stock structural-grade aluminum equivalents from Ameristar for cases where the lead time on ActiveYards OEM exceeds your inspection schedule. The aftermarket equivalents carry the same mill finish and tensile spec but cost 15 to 20 percent less; we quote both options in writing so you can decide.

Signs Your ActiveYards Home Additions & ADU Is Failing

Professional contractor applying thin-set mortar to a kitchen backsplash
Signs Your ActiveYards Home Additions & ADU Is Failing
  • Posts lean or rack at the connection to new construction. The ActiveYards bracket system relies on a four-point bolt pattern into wood or steel framing. If your addition’s contractor used standard lag bolts instead of the specified through-bolts with compression washers, the aluminum post will oval out the bolt holes within two Santa Clarita wind seasons. We find this most often on garage conversions where the fence ties into a new stucco wall that wasn’t back-blocked for lateral load.
  • Gate sags or binds against the new concrete flatwork. ActiveYards gates use a welded aluminum frame with adjustable hinge barrels. When the gate was hung before the ADU’s concrete cured fully, settlement shifts the barrel alignment. The hinge pin then wears eccentrically, and the gate drops 1/8 inch per year until it drags. Catching this early means replacing the barrel assembly; waiting means cutting the frame and re-welding.
  • Panels rattle in high Santa Ana wind events. The picket-to-rail connection on Dogwood and Hawthorne series uses a snap-in nylon clip that degrades in UV after eight to ten years. In Santa Clarita’s 280-plus annual days of sun, we’ve measured clip brittleness at five to seven years on south-facing runs. The symptom is audible before it’s visible: a ticking rattle at 25 mph gusts that becomes a clatter at 40 mph.
  • Corrosion bloom at post base where irrigation hits daily. ActiveYards aluminum is mill-finished, not anodized, and the Santa Clarita water table carries enough mineral content to pit the surface where standing water collects. We see this at post bases in Saugus and Canyon Country where sprinkler arcs were adjusted after the fence went in. The structural integrity lasts years longer than the appearance, but once pitting reaches 1/16 inch depth, the post is no longer code-compliant for pool enclosures or ADU setback barriers.
  • Bracket bolts loosen quarterly despite re-tightening. This is thermal cycling, not user error. Santa Clarita sees 40-degree day-to-night swings in shoulder seasons. Aluminum expands at roughly twice the rate of steel fasteners. Without anti-seize compound and proper torque sequence, the bolt preload drops 30 percent in the first year. The fix is systematic: pull each bolt, inspect for galling, replace with stainless steel hardware rated for dissimilar-metal contact, and torque to ActiveYards spec with a calibrated wrench.
BeforeBefore
AfterAfter

Replacement Cost & What’s Included

Scope Price Range in Santa Clarita What’s Included
Post and bracket replacement (tie-in to addition) $1,200 - $3,400 OEM or Ameristar post, hardware, structural attachment to existing framing, stucco patch or trim integration
Gate rebuild with new hinge barrels and latch $800 - $2,200 Aluminum frame inspection, barrel replacement, drop adjustment, latch alignment, operational test
Full panel replacement (snap-clip failure) $2,400 - $5,800 Panel removal, rail inspection, clip replacement with UV-stabilized nylon or aluminum crimp alternative, rehang
Post base corrosion repair $600 - $1,800 Post cutback, aluminum splice sleeve or full replacement, concrete break-out and re-pour, drainage correction
Full ActiveYards fence tie-in to new home addition $4,500 - $12,000 Layout, posts, panels, gates, hardware, integration with addition framing, HOA documentation photo set
Complete home addition (including fence integration) $45,000 - $130,000 Full written scope, plans, permits, inspections, all trades, documented photo record, 365-Day Done Right Promise
Detached ADU with setback fencing $90,000 - $220,000 Same as above plus utility tie-ins, fire separation, independent metering where required

What drives the range: post count, whether we’re tying into wood framing or CMU, stucco integration complexity, and whether your Santa Clarita HOA requires a pre-installation photo match. Under Clause 1 of the Haven Standard, you receive a flat written price before any work starts, with line-item breakdown. No change proceeds without a signed change order. Our projects finish within a few percent of the agreed number because we don’t start until the number is agreed.

DIY or Call Us?

Contractor installing white marble kitchen countertop on new cabinetry
DIY or Call Us?

There’s a short list an owner can safely check. Verify that bracket bolts are present and not obviously backed out. Confirm the gate stop is contacting before the latch does. Look for standing water at post bases after irrigation. These are observations, not repairs, and they tell you whether to schedule us before the next wind event.

Where DIY goes wrong: cutting an ActiveYards post with a wood blade will seize and kick. Drilling aluminum without a pilot and lubricant walks the bit and ovalizes the hole. And any modification to a fence that serves as a pool barrier or ADU setback boundary in Santa Clarita requires re-inspection by the city; an owner-installed repair without permit documentation can stall your certificate of occupancy. We’re licensed, insured, and bonded, and we pull permits as standard on any structural tie-in. Call (747) 294-3985 to schedule your free estimate. We’ll document what we find, quote it in writing, and show up with the right parts and the right fasteners.

Get the price in writing before anything starts.A real person answers, day or night.
Call now

FAQs

Need Construction help in Santa Clarita? Licensed & insured · Free written quotes response · free estimates
Call (747) 294-3985
Local Service Coverage

Request a Free Estimate in Santa Clarita

Tell us what you need - Rowan Construction Group Santa Clarita responds fast. No obligation.

By requesting your free estimate, you acknowledge our Privacy Policy and authorize us to contact you by phone, text, or email concerning your request, including by the partner businesses that may perform the service.

Prefer to text? Send a Text
Call Now - 24/7 Dispatch