Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Full Kitchen Remodeling in Santa Clarita, CA
A full kitchen remodel replaces everything in the room – cabinets, countertops, flooring, lighting, plumbing fixtures, and appliances – rather than patching around what’s already there. In Santa Clarita, that scope typically runs between $45,000 and $110,000 depending on square footage, material selections, and whether walls or plumbing lines are moving. Rowan Construction Group delivers a flat written price before any demo begins, and under Clause 1 of the Haven Standard, that number doesn’t change unless you sign a change order first.
If you’re weighing a full gut-and-rebuild against a partial update, the distinction matters more than most contractors explain up front. A full remodel touches the substrate – the drywall behind the tile, the subfloor under the vinyl, the rough plumbing stub-outs hidden behind the cabinet toe-kick. Getting those right at the same time is cheaper and structurally sounder than layering new finishes over problems you’ll excavate again in five years. Our Kitchen Remodeling in Santa Clarita page covers the full range of scopes we handle; this page is specifically for homeowners who are replacing the kitchen from the studs out.
To get a written price with a full scope description, call (747) 294-3985. A live person answers every call.
When You Need Full Kitchen Remodeling
A cosmetic refresh – new cabinet doors, a fresh coat of paint, a single counter swap – makes sense when the bones are solid. But there are conditions where going partial actually costs more in the long run. Here’s what typically pushes a Santa Clarita homeowner toward a full remodel rather than a targeted fix:
- Cabinet boxes are failing, not just dated. If the cabinet frames are bowing, the drawer slides are pulling out of particleboard, or the interior shelves are delaminating from years of Valencia humidity cycling, new doors on failing boxes is money wasted. Full replacement with KraftMaid or Wellborn cabinet lines gives you solid construction with a documented warranty rather than cosmetic cover.
- The layout doesn’t work and walls need to move. A lot of tract homes built in Canyon Country and Saugus through the 1990s have galley kitchens that felt fine for two people and feel impossible for a family. Reconfiguring the triangle between the sink, range, and refrigerator often means relocating a plumbing drain line or a gas stub-out – work that touches the framing and requires permits with the City of Santa Clarita Building and Safety Division. Once you’re pulling permits and opening walls, finishing the whole kitchen at the same time makes practical sense.
- Countertops show water damage at the substrate level. When Cambria or Caesarstone sits on top of a water-damaged base cabinet or a swollen substrate board, replacing only the stone leaves the problem underneath. We photograph the substrate condition on every visit – that documentation is standard, not an add-on – so you see exactly what we’re working with before a decision is made.
- Electrical service to the kitchen is undersized. Older homes in Newhall and Stevenson Ranch often have kitchen circuits that predate induction cooktops, dishwashers with built-in heating elements, and the standard modern appliance load. Adding circuits during a full remodel is straightforward; retrofitting them after new cabinets are installed is expensive and disruptive.
- Flooring failure runs under the cabinets. If the existing tile or hardwood extends under the cabinet runs and the floor has failed – cracked tile over a flex point, cupped hardwood from a slow leak – pulling and replacing the cabinets is the only clean way to address it. A partial job that stops at the cabinet line is a visible patch that will always look like a patch.
- The home value math makes full replacement the right call. In Santa Clarita’s current market, a kitchen that looks significantly upgraded relative to the neighborhood’s comparables tends to recover a meaningful percentage of its cost at resale. Buyers doing walkthroughs in Valencia and Stevenson Ranch distinguish between a partial refresh and a genuine remodel. We’re not in the business of selling you a bigger scope than you need, but when the numbers support a full project, we say so plainly.
Our Full Kitchen Remodeling Process

Every full kitchen remodel Rowan Construction Group completes follows the same documented sequence. There are no surprises in the field because the planning work happens before anyone picks up a pry bar.
-
Written Estimate with Full Scope Description
We visit the kitchen, measure it, photograph the existing conditions, and deliver a flat written price with a line-by-line scope – materials specified by brand and product line, labor broken out by trade, permit fees included. This is not a range or a verbal ballpark. The number on the page is the number you’re agreeing to. If you have a competing written estimate, bring it: our Free Second Opinion offer means we’ll review it line by line at no charge, which is useful whether you hire us or not. -
Permit Procurement with the City of Santa Clarita
A full kitchen remodel that moves plumbing, adds circuits, or removes a non-load-bearing wall requires permits from Santa Clarita Building and Safety. We handle the permit application and scheduling of required inspections as part of the project scope – that cost is written into your estimate, not invoiced as a surprise at the end. Permitted work also protects you at resale; unpermitted kitchen work is a standard disclosure item in California real estate transactions and can affect your sale price or financing. -
Demo and Substrate Assessment
Cabinets, countertops, flooring, and fixtures come out. At this stage, the photo documentation record begins in earnest – we photograph wall cavities, subfloor conditions, plumbing rough-ins, and electrical box locations before anything new goes in. If the demo reveals a condition not visible during the estimate (a leak-damaged subfloor section, for example, that was hidden under the existing vinyl), we stop, document it, and present a written change order before proceeding. No work on a changed scope happens without your signature first. -
Rough Work: Framing, Plumbing, and Electrical
If the layout is changing, framing happens first. Plumbing and electrical rough-in follows – drain relocations, new circuit runs, exhaust ducting for the range hood. All rough work is inspected and signed off by the city before anything gets closed up in drywall. This inspection record is part of your project documentation. -
Finish Installation: Cabinets, Countertops, Flooring, Fixtures
Cabinet installation comes before countertop templating – the stone fabricator measures off the installed boxes, not off a drawing. Cambria and Caesarstone templating typically happens 2-3 days after cabinet installation, with countertop delivery and installation following within 10-14 days depending on the slab. Flooring, backsplash tile, plumbing fixture connections, and appliance setting happen in sequence. Each trade signs off before the next begins. -
Final Walk-Through and 365-Day Done Right Promise Documentation
At project close, we walk the kitchen with you, item by item against the original scope. Any item that doesn’t meet the written specification gets corrected before we consider the job complete. The 365-Day Done Right Promise – documented in writing, not described verbally – means that if something isn’t right within a year of completion, Rowan makes it right. You receive the full photo record of the project, the signed permit final, and the written warranty before our crew leaves.
Before
AfterFull Kitchen Remodeling Pricing in Santa Clarita
Full kitchen remodel costs in Santa Clarita range widely because the variables – square footage, material tier, layout changes, permit complexity – compound quickly. The table below gives honest ranges based on real project types in the Santa Clarita Valley. Every number below assumes a written flat price delivered before work begins.
| Project Type | Typical Range (Santa Clarita) | Key Cost Drivers |
|---|---|---|
| Entry-level full remodel (same layout, stock or semi-custom cabinets) | $45,000 – $60,000 | Cabinet line (KraftMaid semi-custom vs. stock), quartz vs. laminate countertops, appliance grade |
| Mid-range full remodel (minor layout adjustment, semi-custom cabinets, quartz counters) | $60,000 – $85,000 | Plumbing relocation, Cambria or Caesarstone slab selection, flooring material, lighting package |
| High-end full remodel (layout reconfiguration, custom cabinetry, premium stone, full appliance package) | $85,000 – $110,000+ | Wellborn custom cabinet lead times, structural work (beam or wall removal), sub-zero/Wolf appliance tier, permit complexity |
What Affects Your Number
- Square footage: A 150-square-foot galley kitchen in an older Newhall home costs less than a 280-square-foot open-plan kitchen in a newer Valencia development, independent of material choices.
- Layout changes: Moving a sink drain line 36 inches adds plumbing rough-in labor and, in some cases, affects the slab. Moving the range to an island adds gas line work and ventilation duct routing. These are line items in the written estimate, not afterthought additions.
- Cabinet specification: The gap between stock, semi-custom (KraftMaid), and fully custom (Wellborn) is real – both in lead time and in cost. Semi-custom typically runs 30-40% more than stock; custom can run 60-80% more. The difference shows in interior finish quality, box construction, and finish durability over 15-20 years.
- Stone selection: Cambria and Caesarstone are both engineered quartz, but slab pricing varies by collection – some collections run $70-90 per square foot installed, others $100-130. The written estimate specifies the collection, not just the brand, so the price is real.
- Permit fees: Santa Clarita permit fees for a full kitchen remodel with electrical and plumbing work typically fall in the $800-$1,800 range depending on valuation and inspection count. These are included in your estimate.
Estimates are free. There is no obligation. If you have a written quote from another contractor, bring it to the conversation – our Free Second Opinion offer covers a line-by-line review at no charge. Call (747) 294-3985 to schedule.
FAQs – Full Kitchen Remodeling

How long does a full kitchen remodel take in Santa Clarita?
Most full kitchen remodels near me in Santa Clarita, CA take 8 to 14 weeks from permit approval to final walk-through, with the widest variable being countertop fabrication lead time and permit turnaround from the city. The pre-construction phase – design confirmation, material ordering, permit application – typically takes 4 to 6 weeks before demo begins. Projects with custom cabinetry add another 2 to 4 weeks to that pre-construction window. We give you a written project schedule with the estimate so you know the timeline before work starts, not after. Call (747) 294-3985 if you have a deadline – we’ll tell you directly whether it’s workable.
Do I need permits for a full kitchen remodel in Santa Clarita?
Yes, in most cases. The City of Santa Clarita Building and Safety Division requires permits when a kitchen remodel includes electrical circuit additions or changes, plumbing relocations, gas line modifications, or structural changes like removing a wall. Cosmetic-only work – new cabinet doors, replacing countertops in the same location, painting – does not typically require permits. A full gut-and-rebuild almost always triggers the permit requirement. Rowan handles permit procurement as part of the project scope, with the fee included in your written estimate. Skipping permits on permitted work is a disclosure issue at resale in California and can complicate financing; it’s not a corner we cut.
Is it cheaper to remodel my kitchen in phases rather than all at once?
Phasing a kitchen remodel costs more in total than doing it all at once, and often produces a worse result. The reason: labor mobilization, permit fees, and material delivery charges apply each time a crew comes out. More practically, if phase one installs new cabinets, countertops, and a kitchen island installation and phase two addresses flooring a year later, the flooring installer is working around finished cabinet runs rather than installing cleanly before the boxes go in. For most homeowners who are planning a full kitchen replacement within 3 to 5 years anyway, the math favors doing it once. We’ll show you the line-by-line comparison in writing so you can decide based on numbers, not on our recommendation alone.
What does the 365-Day Done Right Promise actually cover on a kitchen remodel?
The 365-Day Done Right Promise covers defects in workmanship – installation errors, finish failures, items that were part of the written scope but weren’t executed to the specified standard – for 365 days from project completion. It’s documented in writing, not described verbally, and it’s specific to the scope on your signed contract. It doesn’t replace manufacturer warranties on cabinets, appliances, or countertops (those run separately and are passed through to you at project close), but it does cover how those products were installed. If something isn’t right within the year, call (747) 294-3985 and we make it right – that’s what the promise means in practice.
Why Rowan Construction Group for Your Full Kitchen Remodel
Grant Rowan started this company in 2007 with one operating principle: the price is written before anyone picks up a tool. That’s Clause 1 of the Haven Standard, and it’s the reason Rowan has delivered more than 4,000 projects – across home additions, roofing, kitchens, and six other trades – within a few percent of the agreed cost on every one of them. Not because surprises don’t happen in construction, but because when they do, the response is a signed change order, not a verbal conversation you might remember differently three weeks later.
Our crews are background-checked and uniformed. Every visit includes a documented photo record – substrate conditions, rough-in stages, finished details – delivered to you as a standard part of the project, not an upgrade. The background checks and documentation aren’t marketing; they’re the minimum we’d want if a crew was working in our own home.
For a full kitchen remodel in Santa Clarita, the process starts with a written estimate. No phone quote, no range, no “call to discuss.” A number in writing, a scope in writing, and a warranty in writing – before anyone starts.
Call (747) 294-3985 to schedule your free estimate. If you want to understand the broader scope of remodeling options first, our Kitchen Remodeling in Santa Clarita page covers everything from cabinet-only refreshes to full gut-and-rebuilds, with pricing context for each scope.
Written by Grant Rowan, Owner at Rowan Construction Group Santa Clarita, serving Santa Clarita.







Before
After
Before
After